ValidatedAnalytics validation requiredData / build outstanding
For: Sheran (gate) and the Gate-1 circle: CRM, Analytics, Marketing; Eng briefed, no Product gate.
The one change: Scattered seasonal and anniversary blasts become one governed wave engine, and the Summer Leisure Wave is wave 1.
How to read: Live (watch it as the customer) · AS-IS (today) · TO-BE map (the build logic) · Campaign brief (the plan) · Design brief · Process & actions · Engineering brief · Reference.
Status: design stage; treatments and copy are draft until this journey’s design brief is approved. The 28 Jul rulings are applied throughout (DL-108/109 as amended, DL-006 whole base + the anniversary collision rule, DL-010, DL-009 commissioned, DL-125 adopted). Design’s Railblazer response is in review (Design brief tab).
ValidatedAnalytics validation requiredData / build outstanding