ValidatedAnalytics validation requiredData / build outstanding
For: Sheran and Product for the scoping session, then the Gate-1 review group.
The one change: Journey 10 becomes the lifecycle-state home framework every journey lands on: one state model, one slot map, one governance rule.
How to read: Live (watch it as the customer) · AS-IS (today) · TO-BE map (the Home slot map) · Campaign brief (the plan) · Design brief · Process & actions · Engineering brief · Reference.
Status: Gate-1 DEFINE, the earliest stage of the ten. Every treatment and copy direction is draft and nothing is signed. Ruled 28 Jul: DL-114 ratified as the direction (Product works it through at the scoping session; nothing builds before the DEFINE gate) and DL-029, the landing default, with the recorded condition that this pack’s walkthrough reaches the other packs’ standard before the Product session.
ValidatedAnalytics validation requiredData / build outstanding